Analogy-based model for software project effort estimation

Accurate effort estimation of software development plays an important role to predict how much effort should be prepared during the works of a software project so that it can be completed on time and budget. Some sectors, e.g. banking sectors, were renowned fields of software projects, not only due...

Cur síos iomlán

Sábháilte in:
Sonraí bibleagrafaíochta
Príomhchruthaitheoirí: Ardiansyah, Ardiansyah (Údar), Mardhia, Murein Miksa (Údar), Handayaningsih, Sri (Údar)
Formáid: EJournal Article
Foilsithe / Cruthaithe: Universitas Ahmad Dahlan, 2018-11-11.
Ábhair:
Rochtain ar líne:Get Fulltext
Get Fulltext
Get Fulltext
Get Fulltext
Clibeanna: Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
Cur síos
Achoimre:Accurate effort estimation of software development plays an important role to predict how much effort should be prepared during the works of a software project so that it can be completed on time and budget. Some sectors, e.g. banking sectors, were renowned fields of software projects, not only due to its huge size of project, but also extremely expensive and takes a long time to completion. Project estimation is essential for software development project able to run on time and budget with maximum quality. This study aims to investigate the accuracy of software project effort estimation with the Analogy method using three parameters: Euclidean, Manhattan and Minkowski distance. Analogy based estimation consists several stage included similarity measure, analogy adaptation, estimation calculation and model evaluation. The results showed that the best combination of Analogy methods was using Manhattan distance with an accuracy of 50% MMRE, 28% MdMRE and Pred(25) 48%. Thus, we can concluded that this model can be used to predict accurately.
Cur síos ar an mír:https://ijain.org/index.php/IJAIN/article/view/266