PEMILIHAN ENGINEERING CONTRACTOR PROYEK DANA HIBAH ENERGI TERBARUKAN DENGAN METODE DEMATEL DAN ANP

One of the success keys of the grant fund program for the renewable energy project is in the decision making process to find the engineering contractor with the best quality, effectiveness, and efficiency to implement the process of procurement of goods and services. The objective of this research i...

Full description

Saved in:
Bibliographic Details
Main Author: Pambudi, Agus Setyo (Author)
Format: EJournal Article
Published: Jurusan Manajemen Fakultas Ekonomi dan Bisnis, 2018-06-30.
Subjects:
Online Access:Get Fulltext
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 02036 am a22002173u 4500
001 BISMA_article_view_7878_5553
042 |a dc 
100 1 0 |a Pambudi, Agus Setyo  |e author 
245 0 0 |a  PEMILIHAN ENGINEERING CONTRACTOR PROYEK DANA HIBAH ENERGI TERBARUKAN DENGAN METODE DEMATEL DAN ANP 
260 |b Jurusan Manajemen Fakultas Ekonomi dan Bisnis,   |c 2018-06-30. 
500 |a https://jurnal.unej.ac.id/index.php/BISMA/article/view/7878 
520 |a One of the success keys of the grant fund program for the renewable energy project is in the decision making process to find the engineering contractor with the best quality, effectiveness, and efficiency to implement the process of procurement of goods and services. The objective of this research is to design a systematic selection model for the engineering contractor referring to the conditions, situations, and scopes as required by the "Y" institution. Data were processed using Decision Making Trial and Evaluation Laboratory (DEMATEL) and Analityc Network Process (ANP). The decision criteria referred to the PEPRES No. 70/2012, PERMEN No. 08/PRT/M/2011, and the results of Focus Group Discussion (FGD) conducted by the evaluation team. The assesments from the evaluation team were including internal and financial capability, technical capability, organizational capability, commitment to quality assurance, commitment to health and safety, and pricing. Keywords:     Selection of Engineering Contractor, Grant Fund, Renewable Energy, Decision Making Trial and Evaluation, Analytic Network Process. 
540 |a Copyright (c) 2018 Jurnal Bisnis dan Manajemen 
546 |a eng 
655 7 |a info:eu-repo/semantics/article  |2 local 
655 7 |a info:eu-repo/semantics/publishedVersion  |2 local 
786 0 |n 1978-3108 
786 0 |n 2623-0879 
786 0 |n BISMA: Jurnal Bisnis dan Manajemen; Vol 12 No 2 (2018); 145-157 
787 0 |n https://jurnal.unej.ac.id/index.php/BISMA/article/view/7878/5553 
856 4 1 |u https://jurnal.unej.ac.id/index.php/BISMA/article/view/7878/5553  |z Get Fulltext