A Reliability and Validity of an Instrument to Evaluate the School-Based Assessment System: A Pilot Study
A valid, reliable and practical instrument is needed to evaluate the implementation of the school-based assessment (SBA) system. The aim of this study is to develop and assess the validity and reliability of an instrument to measure the perception of teachers towards the SBA implementation in school...
Sábháilte in:
Príomhchruthaitheoir: | |
---|---|
Formáid: | EJournal Article |
Foilsithe / Cruthaithe: |
Institute of Advanced Engineering and Science,
2016-06-01.
|
Ábhair: | |
Rochtain ar líne: | Get fulltext |
Clibeanna: |
Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
|
Ar líne
Get fulltext3rd Floor Main Library
Gairmuimhir: |
A1234.567 |
---|---|
Cóip 1 | Ar fáil |