Integrated Engineering Project Management Approach for Typical Small to Medium Manufacturing Companies
The aim of this paper is to identify the problem extents and successfully applying project management in SMEs with a focus on manufacturing industries. The organization of the study was mainly divided into the activity of literature study and the investigation through a survey conduct aimed to measu...
Saved in:
Main Authors: | , , |
---|---|
Format: | EJournal Article |
Published: |
Institute of Advanced Engineering and Science,
2017-11-01.
|
Subjects: | |
Online Access: | Get fulltext |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 02219 am a22003133u 4500 | ||
---|---|---|---|
001 | ijeecs10036_7659 | ||
042 | |a dc | ||
100 | 1 | 0 | |a Adesta, Erry Yulian Triblas |e author |
100 | 1 | 0 | |e contributor |
700 | 1 | 0 | |a Abdullah K B, Mohammed |e author |
700 | 1 | 0 | |a Alazemi, Yahya A |e author |
245 | 0 | 0 | |a Integrated Engineering Project Management Approach for Typical Small to Medium Manufacturing Companies |
260 | |b Institute of Advanced Engineering and Science, |c 2017-11-01. | ||
500 | |a https://ijeecs.iaescore.com/index.php/IJEECS/article/view/10036 | ||
520 | |a The aim of this paper is to identify the problem extents and successfully applying project management in SMEs with a focus on manufacturing industries. The organization of the study was mainly divided into the activity of literature study and the investigation through a survey conduct aimed to measure the awareness and implementation of project management at the selected SMEs in Malaysia. The questionnaire was designed with a section (Section A) involving project management in general and another section (Section B) involving the implementation of it. It was found that the level of awareness and implementation of project management especially in the selected small and medium manufacturing companies in Malaysia was quite satisfying. Most of the manufacturing companies were implementing project management, but the level was depending on the organization in the company itself. | ||
540 | |a Copyright (c) 2017 Institute of Advanced Engineering and Science | ||
540 | |a http://creativecommons.org/licenses/by-nc-nd/4.0 | ||
546 | |a eng | ||
690 | |||
690 | |a Manajemen Proyek, Perusahaan Manufaktur, Perusahaan Kecil Menengah | ||
655 | 7 | |a info:eu-repo/semantics/article |2 local | |
655 | 7 | |a info:eu-repo/semantics/publishedVersion |2 local | |
655 | 7 | |2 local | |
786 | 0 | |n Indonesian Journal of Electrical Engineering and Computer Science; Vol 8, No 2: November 2017; 541-545 | |
786 | 0 | |n 2502-4760 | |
786 | 0 | |n 2502-4752 | |
786 | 0 | |n 10.11591/ijeecs.v8.i2 | |
787 | 0 | |n https://ijeecs.iaescore.com/index.php/IJEECS/article/view/10036/7659 | |
856 | 4 | 1 | |u https://ijeecs.iaescore.com/index.php/IJEECS/article/view/10036/7659 |z Get fulltext |