Uncertainty of the implementation time of geodynamic monitoring system in multi-criteria ranking of alternatives

The paper deals with the problem of ranking alternatives to geodynamic monitoring systems in the case of uncertainty of their implementation time. The problem is characterized by the fact that the choice of alternatives and the effect of it depends on the quality properties of the applied organizati...

Full description

Saved in:
Bibliographic Details
Main Authors: Kuzichkin, O.R (Author), Loginov, I.V (Author), Eremenko, V.T (Author), Eremenko, S. V. (Author), Vasilyev, G.S (Author), Grecheneva, A.V (Author)
Format: EJournal Article
Published: Institute of Advanced Engineering and Science, 2020-03-01.
Subjects:
Online Access:Get fulltext
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 02331 am a22003493u 4500
001 ijeecs20506_13504
042 |a dc 
100 1 0 |a Kuzichkin, O.R.  |e author 
100 1 0 |e contributor 
700 1 0 |a Loginov, I.V.  |e author 
700 1 0 |a Eremenko, V.T.  |e author 
700 1 0 |a Eremenko, S. V.  |e author 
700 1 0 |a Vasilyev, G.S.  |e author 
700 1 0 |a Grecheneva, A.V.  |e author 
245 0 0 |a Uncertainty of the implementation time of geodynamic monitoring system in multi-criteria ranking of alternatives 
260 |b Institute of Advanced Engineering and Science,   |c 2020-03-01. 
500 |a https://ijeecs.iaescore.com/index.php/IJEECS/article/view/20506 
520 |a The paper deals with the problem of ranking alternatives to geodynamic monitoring systems in the case of uncertainty of their implementation time. The problem is characterized by the fact that the choice of alternatives and the effect of it depends on the quality properties of the applied organizational and technical solutions, taking into account the time of implementation. The ordering of alternatives is proposed taking into account the uncertainty of the implementation time factors. Ranking is realized by comparing the trees of functional characteristics of alternatives taking into account the compliance of their characteristics with time-varying requirements. The scope of the proposed method is the choice of configurations of geodynamic monitoring systems with significant differences in the implementation time of alternatives. 
540 |a Copyright (c) 2019 Institute of Advanced Engineering and Science 
540 |a http://creativecommons.org/licenses/by-nc/4.0 
546 |a eng 
690
690 |a Geodynamic monitoring system, Implementation time, Incompleteness, Ranking, Requirements change, Requirements system 
655 7 |a info:eu-repo/semantics/article  |2 local 
655 7 |a info:eu-repo/semantics/publishedVersion  |2 local 
655 7 |2 local 
786 0 |n Indonesian Journal of Electrical Engineering and Computer Science; Vol 17, No 3: March 2020; 1249-1257 
786 0 |n 2502-4760 
786 0 |n 2502-4752 
786 0 |n 10.11591/ijeecs.v17.i3 
787 0 |n https://ijeecs.iaescore.com/index.php/IJEECS/article/view/20506/13504 
856 4 1 |u https://ijeecs.iaescore.com/index.php/IJEECS/article/view/20506/13504  |z Get fulltext