Optimal DG Placement with the Aim of Profits Maximization
Using distributed generation power plants is common due to advantages such as system capacity release, voltage support and reduced energy losses in power networks. Prior to the creation of distributed generation plants (DG), economic calculation is needed in order to find the optimum location. In th...
Saved in:
Main Author: | Dorahaki, Sobhan (Author) |
---|---|
Format: | EJournal Article |
Published: |
Institute of Advanced Engineering and Science,
2016-02-01.
|
Subjects: | |
Online Access: | Get fulltext |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimal operating scenario for Polerood hydropower station to maximize peak shaving and produced profit
by: Forouzi Feshalami, Behzad
Published: (2018) -
Cardiac Modeling: Aiming for Optimization of Therapy
Published: (2020) -
Optimal location and sizing of DG and D-STATCOM in distribution networks
by: Reddy Salkuti, Surender
Published: (2019) -
Optimal Tuning and Placement of Power System Stabilizers Based Eigenvalue
by: Bibaya, Lawrence, et al.
Published: (2016) -
Effect of optimal Multi-DG siting and sizing in transmission system using hybrid optimization technique for voltage control
by: A. Shaaya, Sharifah, et al.
Published: (2020)