Fuzzy Optimization of Construction Engineering Project Schedule Based on Critical Chain Management
Critical chain management was the very important theory innovation in the development of construction project schedule management field in recent years. Compared with the traditional methods of construction project schedule management, the methods of critical chain management considered resource con...
Saved in:
Main Authors: | , , |
---|---|
Format: | EJournal Article |
Published: |
Institute of Advanced Engineering and Science,
2013-12-01.
|
Subjects: | |
Online Access: | Get fulltext |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 02081 am a22002893u 4500 | ||
---|---|---|---|
001 | ijeecs2903_4032 | ||
042 | |a dc | ||
100 | 1 | 0 | |a LIU, Jianbing |e author |
100 | 1 | 0 | |e contributor |
700 | 1 | 0 | |a REN, Hong |e author |
700 | 1 | 0 | |a DU, Junshu |e author |
245 | 0 | 0 | |a Fuzzy Optimization of Construction Engineering Project Schedule Based on Critical Chain Management |
260 | |b Institute of Advanced Engineering and Science, |c 2013-12-01. | ||
520 | |a Critical chain management was the very important theory innovation in the development of construction project schedule management field in recent years. Compared with the traditional methods of construction project schedule management, the methods of critical chain management considered resource constraints into construction project schedule management, the construction project cycle was shortened and the efficiency was enhanced by using the dynamic thinking and circulation pattern to manage whole project. In view of the progress of critical chain management of the article, fuzzy theory was used to calculate and optimize the buffer zone sizes with the determination of the buffer size of the existing resources in certain critical chain management so as to shorten the cycle. DOI: http://dx.doi.org/10.11591/telkomnika.v11i12.3591 | ||
540 | |a Copyright (c) 2013 Institute of Advanced Engineering and Science | ||
540 | |a http://creativecommons.org/licenses/by-nc-nd/4.0 | ||
546 | |a eng | ||
690 | |a optimization; construction project schedule; critical chain management; the buffer zone; fuzzy theory | ||
655 | 7 | |a info:eu-repo/semantics/article |2 local | |
655 | 7 | |a info:eu-repo/semantics/publishedVersion |2 local | |
655 | 7 | |2 local | |
786 | 0 | |n Indonesian Journal of Electrical Engineering and Computer Science; Vol 11, No 12: December 2013; 7277-7283 | |
786 | 0 | |n 2502-4760 | |
786 | 0 | |n 2502-4752 | |
786 | 0 | |n 10.11591/ijeecs.v11.i12 | |
787 | 0 | |n https://ijeecs.iaescore.com/index.php/IJEECS/article/view/2903/4032 | |
856 | 4 | 1 | |u https://ijeecs.iaescore.com/index.php/IJEECS/article/view/2903/4032 |z Get fulltext |