Fuzzy Optimization of Construction Engineering Project Schedule Based on Critical Chain Management
Critical chain management was the very important theory innovation in the development of construction project schedule management field in recent years. Compared with the traditional methods of construction project schedule management, the methods of critical chain management considered resource con...
Saved in:
Main Authors: | LIU, Jianbing (Author), REN, Hong (Author), DU, Junshu (Author) |
---|---|
Format: | EJournal Article |
Published: |
Institute of Advanced Engineering and Science,
2013-12-01.
|
Subjects: | |
Online Access: | Get fulltext |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Modeling and scheduling engineering biotechnology building using bim and microsoft project
by: MUHARANI, Monica Diesti, et al.
Published: (2021) -
Risk Management in Construction Projects
Published: (2019) -
Planning and Scheduling Optimization
Published: (2021) -
Application of Optimization in Production, Logistics, Inventory, Supply Chain Management and Block Chain
by: Sarkar, Biswajit
Published: (2020) -
Sustainable Construction Engineering and Management
Published: (2021)