Perancangan Tools Pengukuran Kinerja Perusahaan dan Karyawan dengan Menggunakan Objective Matrix

Performance measurement is a management tool to improve the decision making quality for organizational performance improvement. Performance management is about how to manage activities within an organization to achieve its goals. The performance measurement design requires performance indicators for...

Full description

Saved in:
Bibliographic Details
Main Author: AMILIA, Winda (Author)
Format: Academic Paper
Published: AGROINTEK Volume 7, No.1 Maret 2013, 2021-04-21T05:04:24Z.
Subjects:
Online Access:Get Fulltext
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01826 am a22002293u 4500
001 repository_unej_123456789_104304
042 |a dc 
100 1 0 |a AMILIA, Winda  |e author 
245 0 0 |a Perancangan Tools Pengukuran Kinerja Perusahaan dan Karyawan dengan Menggunakan Objective Matrix 
260 |b AGROINTEK Volume 7, No.1 Maret 2013,   |c 2021-04-21T05:04:24Z. 
500 |a http://repository.unej.ac.id/handle/123456789/104304 
500 |a KODEPRODI1710102#Teknologi Industri Pertanian 
500 4 1 |u NIDN0024038306 
520 |a Performance measurement is a management tool to improve the decision making quality for organizational performance improvement. Performance management is about how to manage activities within an organization to achieve its goals. The performance measurement design requires performance indicators formed from the dimensions of satisfaction and employee contributions to the company. By using the dimensions of employee satisfaction structured business goals to be achieved through the fulfillment of employee satisfaction firm. Business objectives is the basis for build Key Performance Indicators in this measurement design. Based on the results of the KPIs identification, there are 12 KPIs to measure corporate performance to the employee. The results shown on OMAX that 4 KPIs on the highest target, and 8 KPIs are still under target. Measurement results compiled in Objective Matrix (OMAX) to determine the level / achievement level performance indicators set targets. 
546 |a Ind 
690 |a employee satisfaction 
690 |a performance management 
690 |a key performance indicators 
690 |a objective matrix 
655 7 |a Article  |2 local 
787 0 |n http://repository.unej.ac.id/handle/123456789/104304 
856 4 1 |u http://repository.unej.ac.id/handle/123456789/104304  |z Get Fulltext