Perancangan Ulang Tata Letak Fasilitas Produksi dengan Metode Grafik dan Metode Craft di UD. Primadona

UD. Primadona is a company that sells typical Jember snacks. At the moment, the condition of the facility layout of UD. Primadona faced many problems. One of them is a distinctive design that there is a long flow of material transfer. Transferring materials from the cutting department to the packagi...

Full description

Saved in:
Bibliographic Details
Main Authors: KUSWARDHANI, Nita (Author), SURYADHARMA, Bertung (Author), PALWAGUNA, Muhammad Saka (Author)
Format: Academic Paper
Published: AGROINTEK, 2022-03-25T02:27:56Z.
Subjects:
Online Access:Get Fulltext
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01863 am a22002653u 4500
001 repository_unej_123456789_106001
042 |a dc 
100 1 0 |a KUSWARDHANI, Nita  |e author 
500 |a Kodeprodi#1510301#IlmuTanah 
500 |a NIDN#0031077102 
500 |a NIDN#760018063 
500 |a http://repository.unej.ac.id/xmlui/handle/123456789/106001 
700 1 0 |a SURYADHARMA, Bertung  |e author 
700 1 0 |a PALWAGUNA, Muhammad Saka  |e author 
245 0 0 |a Perancangan Ulang Tata Letak Fasilitas Produksi dengan Metode Grafik dan Metode Craft di UD. Primadona 
260 |b AGROINTEK,   |c 2022-03-25T02:27:56Z. 
520 |a UD. Primadona is a company that sells typical Jember snacks. At the moment, the condition of the facility layout of UD. Primadona faced many problems. One of them is a distinctive design that there is a long flow of material transfer. Transferring materials from the cutting department to the packaging department must go through the production department passed (backtrack). This flow can lead to a big total displacement moment, allowing an increase in material handling costs and indirectly increasing production costs. So, it is necessary to make or change the layout to be more effective and efficient. This study aimed to design using two methods, the CRAFT method and the Graph method. The results showed that alternative graphic method 2 was the best solution based on Material Handling Cost (OMH). This method has less displacement moment per day, and total OMH than the existing design, 89 meters per day and Rp. 7,039.90 respectively. 
546 |a other 
690 |a Layout 
690 |a CRAFT 
690 |a Graph 
690 |a Material handling cost 
655 7 |a Article  |2 local 
787 0 |n http://repository.unej.ac.id/xmlui/handle/123456789/106001 
856 4 1 |u http://repository.unej.ac.id/xmlui/handle/123456789/106001  |z Get Fulltext