ANALISIS PENJADWALAN PADA PROYEK DESAIN INTERIOR PESAWAT DENGAN METODE PERT DAN PDM DI PTDI

Regita Afifah. 1503696. "Analisis Penjadwalan pada Proyek Desain Interior Pesawat dengan Metode PERT dan PDM di PTDI". Dibawah bimbingan Dr. Chairul Furqon, S.Sos, M.M dan Dr. H. Mokh. Adib Sultan, S.T, M.T. Latar belakang penelitian ini adalah PTDI masih memiliki permasalahan dalam membua...

Full description

Saved in:
Bibliographic Details
Main Author: Regita Afifah, - (Author)
Format: Academic Paper
Published: 2019-08-21.
Subjects:
Online Access:http://repository.upi.edu/3992/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Regita Afifah. 1503696. "Analisis Penjadwalan pada Proyek Desain Interior Pesawat dengan Metode PERT dan PDM di PTDI". Dibawah bimbingan Dr. Chairul Furqon, S.Sos, M.M dan Dr. H. Mokh. Adib Sultan, S.T, M.T. Latar belakang penelitian ini adalah PTDI masih memiliki permasalahan dalam membuat perencanaan jadwal pengerjaan proyek yang menyebabkan ketidaktepatan waktu penyelesaian dari jadwal yang sudah direncanakan. Perencanaan jadwal yang saat ini digunakan adalah dengan membuat timeline keseluruhan pengerjaan proyek seluruh pesawat. Penelitian ini merupakan penelitian deskriptif dengan menggunakan metode PERT (Program Evaluation and Review Technique) dan PDM (Precedence Diagram Method). Kedua metode tersebut adalah metode yang biasa digunakan untuk membuat perencanaan jadwal suatu proyek dan melihat berapa probabilitas atau kemungkinan proyek tersebut bisa diselesaikan tepat waktu berdasarkan jadwal yang sudah direncanakan. Setelah dilakukan penelitian dengan menggunakan metode PDM dan PERT, didapatkan total durasi yang dibutuhkan untuk menyelesaikan proyek desain interior pesawat CN235-220 NNP1 VIP adalah selama 169 hari dengan probabilitas sebesar 52%. Sedangkan untuk proyek pemasangan interior pesawat CN235-220 NNP1 VIP, dibutuhkan total durasi selama 191 hari dengan probabilitas sebesar 64%. Kata kunci : Penjadwalan proyek, PDM, PERT. Regita Afifah. 1503696. "Analysis of Scheduling on Aircraft Interior Design Projects with PERT and PDM Methods at PTDI." Under the supervision of Dr. Chairul Furqon, S.Sos, M.M and Dr. H. Mokh. Adib Sultan, S. T, M.T. The background of this research is that PTDI still has problems in making project schedule planning which causes inaccurate completion time from the planned schedule. The schedule planning that is currently used is to make a timeline for the entire work on the entire aircraft project. This research is a descriptive study using PERT (Program Evaluation and Review Technique) and PDM (Precedence Diagram Method) methods. The two methods are the methods commonly used to plan the schedule of a project and see how much the probability or possibility of the project can be completed on time, based on the planned schedule. After conducting research using the PDM and PERT methods, the total duration needed to complete the interior design project of the CN235-220 NNP1 VIP aircraft is 169 days with a probability of 52%. As for the installation project of the CN235-220 NNP1 VIP aircraft, a total duration of 191 days is required with a probability of 64%. Keywords: Project scheduling, PDM, PERT.
Item Description:http://repository.upi.edu/39092/1/S_PEM_1503696_TITLE.pdf
http://repository.upi.edu/39092/2/S_PEM_1503696_CHAPTER1.pdf
http://repository.upi.edu/39092/3/S_PEM_1503696_CHAPTER2.pdf
http://repository.upi.edu/39092/4/S_PEM_1503696_CHAPTER3.pdf
http://repository.upi.edu/39092/5/S_PEM_1503696_CHAPTER4.pdf
http://repository.upi.edu/39092/6/S_PEM_1503696_CHAPTER5.pdf
http://repository.upi.edu/39092/7/S_PEM_1503696_APPENDIX.pdf