MODEL PENILAIAN KONTRAKTOR PADA PROYEK KETENAGALISTRIKAN MENGGUNAKAN METODE AHP DAN FUZZY TOPSIS

Abstract: The objective of this study is to analyze the contractor assessmentmodel for the electricity project. This study focused on the procurement process ofgoods/services for the construction of a 500 kV Duri Kosambi Gas InsulatedSwitchgear Tegangan Ekstra Tinggi (GISTET). The sample consisted o...

Cur síos iomlán

Sábháilte in:
Sonraí bibleagrafaíochta
Príomhchruthaitheoirí: Kusuma, Dodi Angga (Údar), Achmadi, Fuad (Údar), Syairuddin, Bambang (Údar)
Formáid: EJournal Article
Foilsithe / Cruthaithe: Jurusan Manajemen Fakultas Ekonomi dan Bisnis, 2018-09-17.