MODEL PENILAIAN KONTRAKTOR PADA PROYEK KETENAGALISTRIKAN MENGGUNAKAN METODE AHP DAN FUZZY TOPSIS

Abstract: The objective of this study is to analyze the contractor assessmentmodel for the electricity project. This study focused on the procurement process ofgoods/services for the construction of a 500 kV Duri Kosambi Gas InsulatedSwitchgear Tegangan Ekstra Tinggi (GISTET). The sample consisted o...

Full description

Saved in:
Bibliographic Details
Main Authors: Kusuma, Dodi Angga (Author), Achmadi, Fuad (Author), Syairuddin, Bambang (Author)
Format: EJournal Article
Published: Jurusan Manajemen Fakultas Ekonomi dan Bisnis, 2018-09-17.
Subjects:
Online Access:Get Fulltext
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Get Fulltext

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available