MODEL PENILAIAN KONTRAKTOR PADA PROYEK KETENAGALISTRIKAN MENGGUNAKAN METODE AHP DAN FUZZY TOPSIS
Abstract: The objective of this study is to analyze the contractor assessmentmodel for the electricity project. This study focused on the procurement process ofgoods/services for the construction of a 500 kV Duri Kosambi Gas InsulatedSwitchgear Tegangan Ekstra Tinggi (GISTET). The sample consisted o...
Enregistré dans:
Auteurs principaux: | , , |
---|---|
Format: | EJournal Article |
Publié: |
Jurusan Manajemen Fakultas Ekonomi dan Bisnis,
2018-09-17.
|
Sujets: | |
Accès en ligne: | Get Fulltext |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
Internet
Get Fulltext3rd Floor Main Library
Cote: |
A1234.567 |
---|---|
Exemplaire 1 | Disponible |