MODEL PENILAIAN KONTRAKTOR PADA PROYEK KETENAGALISTRIKAN MENGGUNAKAN METODE AHP DAN FUZZY TOPSIS
Abstract: The objective of this study is to analyze the contractor assessmentmodel for the electricity project. This study focused on the procurement process ofgoods/services for the construction of a 500 kV Duri Kosambi Gas InsulatedSwitchgear Tegangan Ekstra Tinggi (GISTET). The sample consisted o...
Sparad:
Huvudupphovsmän: | , , |
---|---|
Materialtyp: | EJournal Article |
Publicerad: |
Jurusan Manajemen Fakultas Ekonomi dan Bisnis,
2018-09-17.
|
Ämnen: | |
Länkar: | Get Fulltext |
Taggar: |
Lägg till en tagg
Inga taggar, Lägg till första taggen!
|
Internet
Get Fulltext3rd Floor Main Library
Signum: |
A1234.567 |
---|---|
Exemplar 1 | Tillgänglig |