MODEL PENILAIAN KONTRAKTOR PADA PROYEK KETENAGALISTRIKAN MENGGUNAKAN METODE AHP DAN FUZZY TOPSIS

Abstract: The objective of this study is to analyze the contractor assessmentmodel for the electricity project. This study focused on the procurement process ofgoods/services for the construction of a 500 kV Duri Kosambi Gas InsulatedSwitchgear Tegangan Ekstra Tinggi (GISTET). The sample consisted o...

Ful tanımlama

Kaydedildi:
Detaylı Bibliyografya
Asıl Yazarlar: Kusuma, Dodi Angga (Yazar), Achmadi, Fuad (Yazar), Syairuddin, Bambang (Yazar)
Materyal Türü: EJournal Article
Baskı/Yayın Bilgisi: Jurusan Manajemen Fakultas Ekonomi dan Bisnis, 2018-09-17.
Konular:
Online Erişim:Get Fulltext
Etiketler: Etiketle
Etiket eklenmemiş, İlk siz ekleyin!

Internet

Get Fulltext

3rd Floor Main Library

Detaylı Erişim Bilgileri 3rd Floor Main Library
Yer Numarası: A1234.567
Kopya Bilgisi 1 Kütüphanede