MODEL PENILAIAN KONTRAKTOR PADA PROYEK KETENAGALISTRIKAN MENGGUNAKAN METODE AHP DAN FUZZY TOPSIS

Abstract: The objective of this study is to analyze the contractor assessmentmodel for the electricity project. This study focused on the procurement process ofgoods/services for the construction of a 500 kV Duri Kosambi Gas InsulatedSwitchgear Tegangan Ekstra Tinggi (GISTET). The sample consisted o...