PENGEBORAN LEPAS PANTAI
Budi Utomo, in this paper explain that offshore drilling carried out to obtain crude oil through the oil wells. The means that must exist in the operation of offshore drilling is a bridge structure (plate form) as a place to put the drilling equipment. Known two kinds of platforms, that is platforms...
Saved in:
主要作者: | |
---|---|
格式: | EJournal Article |
出版: |
Vocational School Diponegoro University,
2012-02-06.
|
主題: | |
在線閱讀: | Get Fulltext |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|