An update of second law analysis and optimization of a single-flash geothermal power plant in Dieng, Indonesia

Dieng geothermal power plant is one of the Geothermal plants located in Indonesia with a total estimated potential of 400 MWe. The reservoir is characterized by water-dominated with 240 to 333◦C temperature. Recently, the company operated one unit of single-flash system with a capacity of 60 MW. To...

Full description

Saved in:
Bibliographic Details
Main Authors: RUDIYANTO, Bayu (Author), BAHTHIYAR, Muhamad Aries (Author), PAMBUDI, Nugroho Agung (Author), WIDJONARKO, Widjonarko (Author), HIJRIAWAN, Miftah (Author)
Format: Academic Paper
Published: Geothermics, 2021-10-08T06:39:22Z.
Subjects:
Online Access:Get Fulltext
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Get Fulltext

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available